Installation

Underlayment Fastening Patterns and Lap Requirements

A fastening schedule belongs to a product and roof assembly. Before installation, obtain the applicable attachment and lap detail; a generic spacing example is not an instruction for every underlayment roll.

Editorial source check: · RIDGELOCK PRO
Sources and scope of this guide ↓

Use this guide for procurement planning. Confirm the supplied product and project-specific installation documents with the responsible designer, installer and approving authority. The sources below do not certify a RIDGELOCK PRO product.

Separate the layers being attached

Roof-deck attachment, underlayment fastening and roof-covering fastening are different details. Identify which layer a drawing describes before using its nail type or spacing. PNNL's roof-deck guidance treats structural attachment, sealing and edge protection as separate parts of the roof system.

Source basis: PNNL — Roof deck sheathing and sealing for sloped roofs.

Check roll width as well as spacing

The 2025 FORTIFIED technical resources include separate sealed-deck details for different synthetic-underlayment widths. Its summary of changes explains that wider rolls can require additional fastener rows. A diagram for a narrower roll should not be transferred unchanged to a 48-inch roll.

These are FORTIFIED program details for specified assemblies. Referring to them does not establish that a RIDGELOCK PRO product is approved for that program or that the detail applies to every project.

Source basis: IBHS — 2025 FORTIFIED technical resources, IBHS — 2025 FORTIFIED summary of changes.

Request an installation package

  • Product code, document revision, roll width, deck material, roof covering and the relevant wind or assembly conditions.
  • Permitted fastener type, cap material and dimensions, corrosion protection, required penetration and deck suitability.
  • Fastener rows, field and lap spacing, perimeter or other special zones, and any temporary-exposure requirements.
  • Side and end laps, approved tape or adhesive where required, substrate preparation and details at edges, ridges, valleys and penetrations.
  • Written clarification from the responsible parties when instructions, project documents or applicable requirements conflict; do not assume the manufacturer's text overrides the adopted code.

Common questions

Can I use a generic 6-inch or 12-inch spacing?
Use those numbers only when the applicable product and assembly detail specifies them. The correct fastener rows, spacing and zones must be identified together.
Can staples replace cap nails?
Confirm the permitted fastener in the applicable installation detail and requirements. Do not substitute based only on a general article or a similar-looking product.
Should every lap be taped?
Use the lap treatment specified for the selected product and assembly. Confirm compatibility and preparation requirements before adding tape, adhesive or a self-adhered component.

Sources and scope of this guide

Sources checked on 15 October 2026. ASTM references use the publisher’s public scope or abstract; the complete procedures and acceptance criteria require the applicable full standard. Code references identify the stated model-code edition, not local adoption. This is an editorial update, not project engineering approval or a supplied-product report review.

Keep reading

Related resources

All resources

Products

Where this applies

Need the spec sheet behind the claim?

Tell us the product, roll specification and destination. Request the available product documents and a quotation; confirm report scope and any missing documents before ordering.